Construction

 

Roads and Highways

Building highways to strengthen connectivity

With a fleet of sophisticated construction equipment manned by skilled workers and engineers, Sadbhav, effortlessly builds roads which reduces distance and bridges that connects our nation and brings people closer.

Our effective co-ordination ensures smooth sailing of the projects from beginning to end. This has resulted into a successful track record of constructing more than 6242.48 Lane kilometers & 3380 Lane kilometers under construction of road & highways for NHAI, State Government and private developers. We have been awarded with cash bonus for NH-79 and appreciation from World Bank for timely and successfully completion of Karnataka projects.

Sadbhav had incorporated Sadbhav Infrastructure Project Limited (SIPL), as a subsidiary, back in 2007 as an asset holding company for Road & Other Infrastructure BOT Projects. SIPL currently has 12 BOT Projects under its control of which 8 are fully operational, 1 is partially operational and others are under various stages of construction. All these projects are Special Purpose Vehicles (SPVs) controlled by SIPL.

Our major completed projects include, widening & strengthening of NH 15(ADB funded) for NHAI-106 kilometers; early completion of Sardar Patel Ring Road, Ahmedabad -76.21 kilometers and rehabilitating & upgrading carriageway for sections of NH 8, NH 79 & NH 76 for NHAI. With 18 Ongoing projects, of outstanding value Rs. 4748.37 crore, Sadbhav road portfolio is bound to grow in the forthcoming years.

Development of Six Lane Eastern Peripheral Expressway (NH No. NE-II) in the state of Uttar Pradesh and Haryana on EPC mode – Package 1

Sadbhav Bhavnagar Highway Private Limited
Four laning of Bhavnagar-Talaja section of NH-8E from km. 7.090 to km. 53.585 (Design ch. From km. 6.945 to km. 54.990) (Package –I) in the State of Gujarat to be executed on Hybrid Annuity Mode under NHDP Phase-IV)
819
Hybrid Annuity Model
Sadbhav Una Highway Private Limited
Four laning of Una to Kodinar of NH-8E from Km. 180.478 to Km 221.610 (Design Chainage from Km 181.450 to Km 222.400) (Package –V) in the State of Gujarat on Hybrid Annuity Mode under NHDP Phase-IV)
623
Hybrid Annuity Model
Sadbhav Nainital Highway Private Limited
Four Laning of Rampur – Kathgodam Section of NH-87 from Km 42.791 (design chainage km. 43.446) to km 88.000 (Design chainage km. 93.226) [Package-II] in the State of Uttar Pradesh and Uttarakhand under NHDP Phase-III on Hybrid Annuity Mode.
657
Hybrid Annuity Model
Sadbhav Rudrapur Highway Private Limited
Four Laning of Rampur – Kathgodam Section of NH-87 from Km 0.000 (km. 190.000 of NH-24) to km. 42.791 (Design Chainage 43.446) [Package-I] in the State of Uttar Pradesh under NHDP Phase-III on Hybrid Annuity Mode (“Project”)
738
Hybrid Annuity Model
Raj - Athagarh - Narasinghpur
Widening & Strengthening of Raj – Athagarh - Narasinghpur road(SH-65) to 2-Lane without paved shoulder from 0/000 Km to 80/200 Km under SHDP for the year 2013-14
139.50
23/05/2014
22/05/2016
EPC Basis
Rajsamand – Bhilwara
Four Laning of Rajsamand – Bhilwara Section NH – 758 (from Km. 0.000 to Km.87.500) under NHDP Phase IV in the State of Rajasthan on DBFOT (Toll) basis
676.10
09/10/2013
06/04/2016
DBFOT Basis
Rohtak to Hissar
Four laning of Rohtak to Hissar Section of NH – 10 from Km 87.000 to Km 170.000 including connecting link from Km 87.000 (NH 10) to Km 348.000 (NH 71) to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III in the State of Haryana
1271.58
26/12/2013
23/06/2016
DBFOT Basis
Malavalli to Pavagada
Upgrading & Maintenance of existing State Highway (SH 3 & 33) from Malavalli to Pavagada (Approx length of 193.344 Kms) in the State of Karnataka on Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) Annuity basis
811.21
12/12/2014
10/06/2017
DBFOT Basis
Jodhpur – Barmer
Widening and Strengthening of Jodhpur – Barmer Section of NH – 112 (Jodhpur to Pachpadra Package-I) with two lane with paved shoulder/four lane from Km 140.000 to Km 225.615 under NHDP – IV in the State of Rajasthan on EPC Mode
212.40
18/10/2014
15/04/2017
EPC Basis
Managuli
Upgradation of the Road from Managuli (Km. 0+000) to Devapura (Km 109+953) of SH – 61 in the State of Karnataka
317.05
27/07/2015
11/02/2018
Item Rate Basis
Ambala - Kaithal
Four-laning of Ambala - Kaithal Section of NH-65 from km 50.860 (Pehowa) to km 95.360 (Kaithal) with paved shoulder (length 44.500 km) in the state of Haryana under NHDP Phase - III on EPC Basis (Package - 2)
459.00
09/01/2016
10/07/2018
EPC Basis
Yamunanagar-Saha-Barwala-Panchkula (Package - 1)
Four-laning of UP/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH – 73 from Km 70.830 to Km 115.400 in the State of Haryana on EPC Mode (Package - 1)
468.00
18/11/2015
16/05/2018
EPC Basis
Yamunanagar-Saha-Barwala-Panchkula (Package - 2)
Four-laning of UP/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH – 73 from Km 115.400 to Km 157.192 in the State of Haryana on EPC Mode (Package - 2)
436.50
18/10/2015
15/04/2018
EPC Basis
Tapa to Bathinda
Development to Four Lanes with paved side shoulders of Tapa to Bathinda section of NH-64 [NEW NH NO. 7] from existing KM 168.00 to KM. 209.405 in Punjab
453.78
28/07/2015
27/07/2017
EPC Basis
Eastern Peripheral Expressway (Package - 1)
Development of six lane Eastern Peripheral Expressway (NH No. NE 11) on EPC Mode Package I from Km 1.000 to Km 22.000
792.00
14/09/2015
12/03/2018
EPC Basis
Eastern Peripheral Expressway (Package - 2)
Development of six lane Eastern Peripheral Expressway (NH No. NE 11) on EPC Mode Package II from Km 22.000 to Km 46.500
756.00
14/09/2015
12/03/2018
EPC Basis
Rohtak Panipat
Four Laning of Rohtak Panipat Section of NH-71A From Km 0.000 [Km 63.300 of NH-10] to Km 80.858 [Km 83.339 of NH-1] in the State of Haryana on BOT Basis.
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
80.858
4-Laning
18/04/2011
06/01/2014
950
Hyderabad- Yadgiri
Design, Engineering, Construiction, Development, Finance, Operation and Maintanance of 4 -laning of Hyderabad- Yadgiri Section from Km 18.600 to Km 54.000 of NH-202 in the state of Andhra Pradesh under NHDP Phase-III on DBFOT (Toll) basis (Package No. NHDP-III/BOT/AP-04)
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
35.400
4-Laning
30/07/2010
10/12/2012
480.22
Ranchi Ring Road (Package - ID : RRR-I)
Improvement Works of Ranchi Ring Road (section III Ch. Km. 0.600 to Ch. Km. 13.350 and Section IV Ch. Km. 0.000 to Km. 6.335) (19.085 kms) in Jharkhand (Package - ID : RRR-I)
Jharkhand Road Projects Implementation Company Limited, Ashoknagar, Ranchi
19.085
6-Laning
18/12/2009
17/10/2012
252
Ranchi Ring Road (Package - ID : RRR-II)
Improvement Works of Ranchi Ring Road (Section V Ch. Km. 0.000 to Ch. Km. 10.007 and Section VI Ch. Km. 0.000 to Km. 7.100) (17.107 Kms) in Jharkhand (Package - ID : RRR-II)
Jharkhand Road Projects Implementation Company Limited, Ashoknagar, Ranchi
17.107
6-Laning
18/12/2009
17/10/2012
225
Maharashtra Border - Dhule
Design, Engineering, Finance, procurement, Construction, operation and Maintenance of 4/6 laning of MP/Maharashtra Border - Dhule section of NH-3 from km 168.500 to km 265.000 in the state of Maharashtra under NHDP phase IIIA on BOT Basis.
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
88.798
4-Laning
21/12/2009
06/09/2012
1072
Bijapur - Hungund
1257.1
Four laning of Bijapur - Hungund section of NH-13 from Km 102.00 to Km 202.00 in the state of Karnataka on Design, Build, Finance, Operate and Transfer ("DBFOT") Toll basis under NHDP-Phase-III (Package No.: NHDP-III/BOT/KNT/05)
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
97.221
4-Laning
05/10/2010
20/06/2012
Vadape – Gonde Project
Widening of 2 lane road and divided carriageway from Km 539+500 to Km 440.000 (Vadape – Gonde section) on NH-3 in the State of Maharashtra on BOT basis.
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
99.500
4-Laning
12/04/2006
31/05/2011
579
Seoni Project/MP - 3
Design, Construction, Development, Finance, Operation and Maintenance of the work of Rehabilitation and Upgrading to 4-lane from km 596/750 to km 653/225 on National Highway No. 7 (NH-7) in the state of Madhya Pradesh under North-South corridor (NHDP Phase-II) on BOT basis Package No. NS-1/BOT/MP-3
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
27.730
4-Laning
22/11/2007
25/05/2010
198.91
Seoni-Chiraidongri
Construction of civil works under MPSRSP-II Package -11 Seoni-Chiraidongri (SH-11A) road project
Madhya Pradesh Road Development Corporation Limited, Bhopal
92.600
2-Laning
26/09/2007
15/02/2010
81.76
Abhanpur (km27) - Rajim (km45) - Gariyaband (km 90.22)
Rehabilitation and Upgradating of Abhanpur (km27) - Rajim (km45) - Gariyaband (km 90.22) Section of Sh 2B in Chattisgarh (Package 7)
Project Director, PIU, ADB Project, Sirpur Bhavan Raipur, Chattisgarh
59.035
2-Laning
20/12/2007
27/11/2009
48.36
Shivpuri - Sheopur -Rajasthan border
Construction of civil works under MPSRSP-II: Package-I Shivpuri - Sheopur -Rajasthan border (SH-06)
Madhya Pradesh Road Development Corporation Limited, Bhopal
142.500
2-Laning
26/09/2007
30/04/2010
114.66
Lalsot to Kota Road
Improvement cum performance based Maintenance on Lalsot to Kota Road in Rajasthan (Contract Package : LJ-1)
Punj Loyd Limited
195.000
2-Laning
31/07/2006
16/10/2009
237.16
Aurangabad - Jalna Road
Providing four laning to Aurangabad - Jalna Road (Km. 10/400 to 60/200) and Zalta Bypass (0/000 to 2/850) and Beed bypass Km. (292/500 to 305/650) on Build, Operate and Transfer (BOT) basis in the state of Maharashtra (51 % share with Prakash)
"Executive Engineer, World Bank Project Division, Aurangabad "
65.800
4-Laning
01/02/2007
28/07/2009
180.63
Rajim (km 0) - Mahasamund (km 39.12)
Rehabilitation and Upgradation of- Rajim (km 0) - Mahasamund (km 39.12) Section of MDR in Chattisgarh (Package 8)
Project Director, PIU, ADB Project, Sirpur Bhavan Raipur, Chattisgarh
34.615
2-Laning
20/12/2007
17/07/2009
33.7
Sardar Patel Ring Road
Improvement & widening to four lane of 2 lane Sardar Patel Ring Road around Ahmedabad city on Build, Operate and Transfer (BOT) basis.
Ahmedabad Urban Development Authority, Sardar Patel Bhavan, Usmanpura, Ahmedabad
76.350
4-Laning
01/01/2007
30/05/2008
518.96
Gagodhar-Radhanpur
Rehabilitation and Upgrading of Gagodhar-Radhanpur section of NH-15 from KM 245.100 to KM 138.800 in the state of Gujarat - Contract Package - V
National Highways Authority of India, G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
106.300
4-Laning
12/02/2005
30/04/2008
341.44
Viramgam-Dhrangadhra
140.02
Strengthening and Paving of shoulders of SH 07:Viramgam-Dhrangadhra (km 58/825 to km 104/263)and Dhrangadhra - Halvad (km 126/000 to km 51/500) Contract No.GSHP/12
Executive Engineer State Road Project Dn.Kashi Vishwanath Plot Rajkot.
92.000
2-Laning
27/10/2003
22/04/2008
Hattigudur to Bidar
Upgradation of Road from Hattigudur to Bidar (Contract U3).
The Project Director, PIU,KSHIP, K.R.Circle,Bangalore
199.000
2-Laning
23/01/2002
30/06/2006
149.56
Chandikhole - Bhadrak
Widening to 4/6 lanes and strengthening of existing 2-lane carriageway of NH-5 in the state of Orissa - Package OR-II - Chandikhole - Bhadrak - for the section Km.61.00 to 98.00
L & T Limited, ECC Division, Kolkata
37.000
4-Laning
18/12/2000
13/04/2005
121.59
Kishangarh - Nasirabad - Bhilwara - Chittogarh - Udaipur
Rehabilitation & Upgrading to 4/6 lane divided Carriageway for Kishangarh - Nasirabad - Bhilwara - Chittogarh - Udaipur Section of NH-8, SH - 7A Nh-79 and Nh-76 Package KU-VI from Mangalwar (Km. 172.000 of NH-76) to Pratapgarh Crossing Udaipur (Km. 113.825 of NH-76) in the Rajasthan State) KU-VI
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
30.000
4-Laning
21/08/2001
28/02/2005
192.12
Kishangarh - Nasirabad - Bhilwara - Chittorgarh - Udaipur
Rehabilitation and Upgradation to 4/6 lane divided carriageway for Kishangarh - Nasirabad - Bhilwara - Chittorgarh - Udaipur Section of NH-8, NH-79 and NH-76 Package (KU-1) from Kishangarh (Km. 363.000 of NH–8) to Nasirabad (Km. 15.000 of NH–79) in Rajasthan state
National Highways Authority of India,G-5 & 6, Sector-10, Dwarka, New Delhi – 110 045
37.000
4-Laning
17/11/2001
15/03/2004
110.21
NH 8B Beti -Bamanbore
Widening to four lane including strengthening of existing two lane of NH 8B from 185 to 207 Km Nr.Bamanbore, Tal & Dist:Rajkot
National Highway Division, Rajkot
22.000
4-Laning
28/06/1999
30/08/2001
24.46
Sayla -Chotila
Widening to four lane including strengthening of existing two lane of NH 8A from 135 to 170 Km Tal & Dist. : Rajkot
National Highway Division, Rajkot
35.000
4 Laning
28/06/1999
31/07/2001
34.77
Padana (Km. 346) to Gandhidham(Km. 361.160)
Widening to four lane including strengthening of existing Two lane of NH8A from Padana (Km. 346) to Gandhidham(Km. 361.160) in Gujarat
National Highway Authority of India, New Delhi
6.000
4-Laning
20/05/1999
19/05/2001
10.21
Samkhiyali (Km. 306) to Bhachau(Km. 324)
Widening to four lane including strengthening of existing Two lane of NH8A from Samkhiyali (Km. 306) to Bhachau(Km. 324) in Gujarat
National Highway Authority of India, New Delhi
18.000
4-Laning
28/08/1998
28/02/2001
42.43
Sambalpur - Rourkela Road Project
Strengthening and widening of Sambalpur - Rourkela Road Project Package- S2
L & T Ltd. ECC construction group,Kolkata
50.000
2-Laning
28/10/1992
31/03/1997
55.51

 

Mining

We help to fulfill the demand for coal, iron and other minerals that our industries need.

The demand of coal is mainly driven by power, cement and steel industry. We at Sadbhav have always seen mining as a major growth driver for SEL, as there are huge opportunities in this field owing to an increased demand for coal, iron and other minerals. Our mining projects range from excavation of Overburden/Waste to removal of Lignite, Coal and Ore. Our client list boasts of stalwarts like Gujarat Heavy Chemicals Ltd, Gujarat Industries Power Company Ltd., Northern Coalfields Ltd., Western Coalfields Ltd., Bharat Coking Coal Ltd., Mahanadi Coalfields Ltd., Singareni Collieries Company Ltd., L&T, HCC and Punj Lloyd.

Our track record shows success in executing a 5-year project for GIPCL involving excavation of overburden and lignite at Vastan Mines. We have executed contracts worth 350 million cubic meters of Overburden/Waste and 19.5 million tonnes of Coal & Lignite and 1.9 million tonnes of Uranium Ore. As on 31/3/2016, the total value of mining contract under execution is approximately Rs. 1974.76 Cr.

We have experience of working with 8.1 cum capacity excavator and 50 T Dumper. We have owned and operated these machines during 1997 to 2003 at GIPCL, Gujarat. We Have been handling more than 1.00 lakh cubic meter overburden in Amlohri OCP of NCL and overall more than 2.00 lakh cubic meter of overburden and 2.30 lakh cubic meter of all type of materials ( OB/Waste, Coal, Lignite & Ore) on daily basis in our ongoing mining projects.

Amlohri OCP, MP
Excavation of OB
Northern Coalfields Limited
5 Years
1086 workers
697.36
Basantimata, Dhanbad
Excavation of OB
Bharat Coking Coal Limited
5.5 Years
500 workers
638.21
Khadsaliya, Bhavnagar
Excavation of OB and Lignite
Gujarat Heavy Chemicals Limited
12 Years
150 workers
305
Banduhurang, Jharkhand
Excavation of OB and ORE
Uranium Corporation of India Limited
6 Years
353 workers
173.13
Dhansar, Dhanbad
Excavation of OB and Coal
Bharat Coking Coal Limited
5 Years
211 workers
302.99
Katras, Dhanbad
Excavation of OB and Coal
Bharat Coking Coal Limited
3 Years
436 workers
266.02
Kapurdi Lignite Mine, Barmer
Excavation of OB and Lignite
South West Mining Limited
2 Years & 9 Months
112.50
Jalipa Lignite Mine, Barmer
Excavation of OB and Lignite
Barmer Lignite Mining Company Ltd, SWML
7 Years
412.50
Malanjkhand, HCL
Excavation of Rock
L & T Ltd.
06/03/1990
10/02/1992
2.4 years
10.1
Bharat Diamond, L & T
Excavation of soil & Rock
L & T Ltd.
27/02/1993
26/07/1993
6 Month
5.18
Vastan Mine, GIPCL
Excavation of OB
Gujarat Industries Power Company Ltd.
31/05/1996
30/11/1997
1.7 Years
8.55
Vastan Mine, GIPCL
Excavation of OB And Lignite
Gujarat Industries Power Company Ltd.
26/11/1997
10/09/2003
6 Years
261.22
Vastan Mine, GIPCL
Excavation of Hard Rock
Gujarat Industries Power Company Ltd.
21/05/1999
3 years
15/05/2002
4.13
Neeljai OCM, WCL
Excavation of OB
Western Coalfields Limited
23/01/2008
21/07/2010
2.7 years
47.28
Bina Extn. OCP, NCL
Excavation of OB
Northern Coalfields Limited
29/11/2007
28/11/2010
3 years
269.35
Junad OCM, WCL
Excavation of OB
Western Coalfields Limited
09/01/2009
31/01/2012
3.5 years
68.06
Manuguru Open Cast II Extension, SCCL
Excavation of OB
Singareni Collieries Company Limited
14/08/2010
16/07/2012
2 years
185.17
Khadia OCP, NCL
Excavation of OB
Northern Coalfields Limited
16/03/2010
27/07/2013
3. 5 years
149.72
Maheshpur Colliery, BCCL
Excavation of OB and Coal
Bharat Coking Coal Limited
06/01/2013
30/03/2014
1.3 years
16.96
Gondudih Colliery, BCCL
Excavation of OB and Coal
Bharat Coking Coal Limited
30/04/2012
30/04/2014
2 years
79.76
Mangrol, Vastan
Excavation of OB and Lignite
Gujarat Industries Power Company Ltd.
25/12/2009
25/06/2014
5.6 Years
270.89
Excavation of OB
Mahanadi Coalfields Limited
30/10/2009
10/10/2014
5 years
225.43
Navinkunada, Maharashtra
Excavation of OB and Coal
Western Coalfields Limited
16/06/2010
28/02/2015
5. 9 years
92.08

 

Irrigation

Irrigation projects for lush green tomorrow

Agriculture accounts for around 17% of the GDP and is the largest employer in the country. However, it is proven beyond doubts that the true potential of agriculture in the country is not realized due to scarcity of irrigation infrastructure in place. We at Sadbhav strive to correct this inadequacy.

We have successfully executed projects like Construction of earthen dams, canal siphons, remodeling and improvement of canals. Due to our experience and execution capabilities, we hold a track record of executing a major portion of world’s largest concrete lined Narmada Main Canal project having capacity of 40,000 cusecs. We have also executed 4 out of the total 9 canal siphons on Narmada Main Canal across different rivers.

We can proudly state, that our team of engineers and workers successfully executed a 13.87 km concrete lining project on the Kakrapar left bank, in a record 75 days. Sadbhav has also successfully completed the construction of NMC in its reach from 108 to 127 km for SSNNL and constructing canal siphon across river Watrak on NMC Kapadwanj for SSNNL. With 12 ongoing projects of outstanding value 1,333 crores, Sadbhav can look forward to irrigate a lush green tomorrow.

Omkareshwar Project Canal system (Phase-III)
Execution of Omkareshwar Project Canal system (Phase-III) comprising of right bank flow canal from RD 68.92 KM. 162.95 km
Govt. of Madhya Pradesh Narmada Valley Development Authority
Madhya Pradesh
31020
Omkareshwar Right Bank Lift Canal
Execution of Omkareshwar Right Bank Lift Canal including its distribution network upto 40 Ha. chak for culturable command area (CCA) of about 28073 Ha. from RD 0.00 KM to 51.281 KM on “Turn-key”
Govt. of Madhya Pradesh Narmada Valley Development Authority
Madhya Pradesh
51993
Omkareshwar Right Bank Lift Canal
Execution of Omkareshwar Right Bank Lift Canal including its distribution network up to 40 Ha. chak for culturable command area (CCA) of about 29947 Ha. from RD 51.281 KM to RD 125.00 KM on “Turn-key” basis,
Govt. of Madhya Pradesh Narmada Valley Development Authority
Madhya Pradesh
34930
Halon Dam Project
Execution of Halon Irrigation Project on Turnkey Basis
Govt. of Madhya Pradesh Narmada Valley Development Authority
Madhya Pradesh
24561
Bahuti Canal
Construction of BAHUTI CANAL which is off taking from Bansagar Dam & and completion & commissioning of earthen canal system with all respect of its distribution net work from RD 18.00 k.m. to 74.00 k.m.
Govt. of Madhay Pradesh, Water Resources Department
Madhya Pradesh
42800
Bhanpura Canal Project ( UNIT-1 Head Works)
Construction of intake Barrel on Gandhi Sagar lake , control structure, Hydraulic Tunnel , open channel & barrage on rewa river near BHANPURA TOWN INCLUDING HEAD SLUICE OF BHANPURA CANAL PROJECT ( UNIT-1 HEAD WORKS)
Govt. of Madhay Pradesh, Water Resources Department
Madhya Pradesh
11750
RSBC-MSBC
EPC tenders for construction of Radhanpur Sub branch canal (RSBC) manpura sub branch canal (MSBC), Distributaries and minors of Radhanpur Branch Canal, RSBC and MSBC (E/w), lining Structures, service road, Gate work, control cabin etc.) together with operation and maintenance of the same for five (5) years.
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
Gujarat
23619.84
Vallabhipur Branch Canal
Constructing Earthwork, C.C.Lining, Structures and Service Road of the Pipli distributory (Ld-3b-Upper Portion from Ch.0 to 15614 M) and its Minors Offtaking from Vallabhipur Branch Canal @Ch. 63.625 KM including Operation, Maintenance & Security for Five Years
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
03/10/2012
29/02/2016
Gujarat
4335.46
Kutchh Branch Canal (Package - IR-III)
Constructing Kutchh Branch Canal reach Ch. 222.728 to 231.022 Km fir Earthwork, C.C. Lining, Structures, service road, Gate work, control cabins and O&M work for 5 year (Package - IR-III)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
03/01/2013
02/01/2016
Gujarat
4887.29
Kachchh Branch Canal (Package-IR-4)
Construction of Kachchh Branch Canal reach ch.231.022 km. to 243.839 km to Earthwork, C.C. lining, Structures, Service Road, Gate work, Control Cabin and O & M for 5 years” (Package-IR-4)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
Gujarat
10139.85
Kachchh Branch Canal (Package-IR-8)
Construction of Kachchh Branch Canal reach ch.263.620 km. to 271.224 km to Earthwork, C.C. lining, Structures, Service Road, Gate work, Control Cabin and O & M for 5 years (Package-IR-8)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
10/07/2013
30/09/2016
Gujarat
8217
Morbi Branch Canal industrial Area
Constructing remaining Works of earthwork, Lining, structures and Service road for Morbi Branch Canal industrial Area reach (ch.109.274 km. To 116.290 km) and (ch.117.850 km. To ch.118.600 Km)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
07/11/2014
31/03/2016
Gujarat
7901.41
Baitarani Left Bank Canal
Excavation And Cement Concrete Lining Of Baitarani Left Bank Canal (BLBC) From Rd 0.00 Km To Rd 9.00 Km Including Construction Of Structures And Service Road
Govt. of Odisha, Department of Water Resources
Odisha
7923.93
Package - 2 of HNSS Phase - II
Investigation, Preparing HPs, designs, drawings, earthwork excavation and construction of CM and CD works of HNSS Main canal reach from 230.000 km to 245.000 km under Package - 2 of HNSS Phase - II in Anantapur District of Andhra Pradesh
Irrigation & C.A.D Department, Andhra Pradesh
Andhra Pradesh
4205.83
Package - 3 of HNSS Phase - II
Investigation, Preparing HPs, designs, drawings, earthwork excavation and construction of CM and CD works of HNSS Main canal reach from 245.000 km to 260.000 km and distributory system to feed an ayacut of 16000 acres under Kharif I.D under Package - 3 of HNSS Phase - II in Anantapur District of Andhra Pradesh
Irrigation & C.A.D Department, Andhra Pradesh
Andhra Pradesh
8287.1
Package - 8 of HNSS Phase - II
Investigation, Preparing HPs, designs, drawings, earthwork excavation and construction of CM and CD works of HNSS Main canal reach from 320.000 km to 340.000 km and distributory system to feed an ayacut of 2800 acres under Kharif I.D under Package - 8 of HNSS Phase - II in Anantapur District of Andhra Pradesh
Irrigation & C.A.D Department, Andhra Pradesh
Andhra Pradesh
9141.79
Package - 52 of HNSS Phase - II
Investigation, Preparing HPs, designs, drawings, earthwork excavation and construction of CM and CD works of Madakasira Branch Canal from 0.000 km to 20.000 km under Package - 52 of HNSS Phase - II in Anantapur District of Andhra Pradesh
Irrigation & C.A.D Department, Andhra Pradesh
Andhra Pradesh
3863.55
Package - 53 of HNSS Phase - II
Package no-53 - Investigation, Preparation of Hydraulic Particulars, Designs, Land Plan Schedules, Drawings & formation of Gollapalli Reservoir with a capacity of 1.613 TMC ON Madakasira Branch canal between km. 8.00 to 10.00 & providing Distributory System to feed an Ayacut of 10000 Acres under the Reservoir including construction of CM & CD works
Irrigation & C.A.D Department, Andhra Pradesh
Andhra Pradesh
5187.83
Karimnagar Project
Earthwork, Excavation, forming embankment and construction CM/CD works of main canal and Distributory system upto water course level CC lining to main canal and other allied works including investigation, designing and estimation of Gouravelly Right side canal from km. 0.000 to 47.725 and left side canal in Karimnagar Project.
Irrigation & C.A.D Department, Andhra Pradesh
Andhra Pradesh
16687.9
Kodimial Project
S Y P - Investigation, designs and execution of Canal Network system including Earth work Excavation and Forming embankment, construction of CMandCD Works and lining of canals up to sub rnrnofs and formdon of Field Channels including Struauras to serve an ayacut of 58800 Acres rn Kmmnagar Dist under Kodimial, Potharam, Surampet, Lschupet and New Tank at +450 and its Concerned Gravity Canals (Canal Network Package Ill)
Irrigation & C.A.D Department, Andhra Pradesh
Andhra Pradesh
9931.32
Shedhi Branch Canal
Improvement of Shedhi Branch Canal Km. 0.00 to 46.03 Km.
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
01/07/1992
17/01/1995
3140.7
Narmada Main Canal - Package Slice-I
Construction of Narmada main Canal ( Earthwork, Lining, structure and service road) ch 108.326 to 127.559 Km.Package Slice-I
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
29/01/1990
28/02/1997
10058
Narmada main Canal (Package-II)
Construction of Narmada main Canal in its reach 155.030 to 168.436 km. (Package-II)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
04/06/1994
31/12/1999
8904
Vallabhipur sub-branch Canal
Construction of canal earthwork and structures of Vallabhipur sub-branch canal
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
18/09/1997
31/12/2000
2409.13
Majalgaon Right Bank Canal
Majalgaon Right Bank Canal Km. 40 to 54 in Dist Beed
Majalgaon Canal Divn. No. 4 Parli, Vaijnath
15/10/1988
03/05/1992
514.6
Maliya Branch Canal
Construction of Maliya Branch canal earthwork and structures
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
11/06/1997
31/12/2000
3861.44
Kakrapar Left Bank Main Canal - Package -I
Rehabilitation to Kakrapar Left Bank Main Canal R.D. 0.0 to 20.60 (Chainage 0.0 to 6.28 Km.) Package -I
Narmada Water Resources and Water Supply Department
15/11/2000
26/01/2001
892.25
Kakrapar Left Bank Main Canal - Package -II
Rehabilitation to Kakrapar Left Bank Main Canal R.D. 20.60 to 45.50 (Chainage 6.28 to 13.87 Km.) Package -II
Narmada Water Resources and Water Supply Department
15/11/2000
26/01/2001
686.3
Watrak Canal Syphon
Constructing Canal syphon across river Watrak at ch.196.188 km. on NMC Kapadwanj, Dist.Kheda
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
10/05/1994
30/06/2001
9348
Narmada Main Canal (Package-6)
Constructing Narmada Main Canal (Earthwork, Lining, Structures, Service Road & Canal Constructing Road) reach Ch.314.356 to 328.843 (Package-6)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
03/09/2000
30/06/2003
4951.95
Narmada Main Canal (Package-4)
Constructing Narmada Main Canal (Earthwork, Lining, Structures, Service Road & Canal Constructing Road) reach Ch.290.605 to 300.336 (Package-4)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
03/06/2000
30/06/2003
5091.67
Khari Syphon
Constructing Canal Syphon across the river Khari on NMC at ch.321.115 km. (Pack-2/2)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
23/04/2000
30/06/2003
2830.62
Pushpawati Syphon
Constructing Canal Syphon across the river Pushpawati on NMC at ch.314.696 km. (Pack-2/1)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
23/04/2000
30/06/2003
2830.62
SBC SLICE-III
Providing & laying double layered burnt clay tiles lining and constructing canal service road, catch water dowels and boundary gutter on SBC reach 0.55 to 70.976 km. (Package-III) km. 19.8 to 29.5.
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
16/05/2001
30/06/2004
1882.91
SBC SLICE-IV
Providing & laying double layered burnt clay tiles lining and constructing canal service road, catch water dowels and boundary gutter on SBC reach 0.55 to 70.976 km. (Package-IV) km. 35.5m to 29.5.
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
16/05/2001
30/06/2004
2188.19
Raw Water Tank Grasim
Construction of Raw Water Tank and allied works at Grasim Industries Ltd.,
Grasim Industries Ltd., Haveri, Karnataka
02/02/2004
10/03/2005
1320
Right Bank Canal (Group-III)
Construction of Right Bank canal from km 56.00 to 63.00, Excavation, Earthwork, cement concrete lining and structures complete (Group-III)
Narmada Development division -2, Jabalpur
14/12/2002
10/10/2005
1771.25
Banas Syphone
Constructing Canal syphon across river Banas at ch. 362.011 km on N.M.C. (Package-2)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
23/11/2004
30/04/2009
11077.18
Narmada Main Canal PKG.-I
Constructing Narmada Main Canal Pack. NMC-I Ch. 388.164 km to 421.977 km
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
24/11/2004
30/04/2010
11397.2
KBC PKG.-1
Constructing Canal (Earth work, Lining, Structures and Service Road) reach Ch.0.00 km. to 8.82 km. (Package-I)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
01/03/2005
15/09/2009
3782.3
KBC PKG.-2
Constructing Canal Earthwork,lining, structures and service road to Kachchh Branch Canal ch. 8.82 to 20.01 km (Package II)
Govt. of Gujarat, Sardar Sarovar Narmada Nigam Ltd.,
01/03/2005
30/04/2010
3744.36
Parallel Lower Ganga Canal
Earthwork for deepening and widening of existing internal section including dewatering of parallel Lower Ganga canal (8900 cuses Capacity)
Chief Engineer (Ram Ganga)
17/10/2013
14/10/2014
13294.89